Thread Rolling7 min read

Flat Thread Rolling Die Design Near a Shoulder

By Jake Wang, Overseas Sales Manager ·

When you order flat thread rolling dies for a shouldered screw or bolt, mark the last full thread from the shoulder face on the part drawing. A visible trace can extend closer to the shoulder than the full thread. The die maker needs the length your mating part must engage, the permitted transition into the shank and the space available for the die edge. These are separate checks even though they all appear near the same end of the thread.

Define the usable thread from the shoulder face

Choose the datum and measurement direction from the approved part drawing. On an axial view, mark the shoulder face, the first visible thread trace toward the tip, and the nearest position where the thread must meet the specified full profile. At the other end, mark any tip chamfer or point that also uses part of the nominal threaded length. Give the thread standard, pitch and tolerance class separately. Where the drawing calls for a particular root contour in the transition, show the cross-section and the inspection requirement.

Include the mating part if it must seat against the shoulder. Its entry chamfer or counterbore determines how much of the transition it can clear. Use the approved mating drawing, including the entry feature and seating face, when discussing engagement. An assembly fit check on a trial piece answers a functional question. Keep the measured full profile and the drawing criteria in the report as well, particularly if the mating part varies across sources.

Tell the supplier which edge faces the shoulder

Mark the installed orientation of both flat dies, including the fixed and moving blocks, the rolling direction and the working edge nearest the shoulder. The motion along the die face carries the blank through the rolling pass. The axial distance from the shoulder to the closest full thread is measured along the fastener. Put arrows on both views. A request for a shorter die lead-in can otherwise be read as a change along the rolling pass when the part drawing actually calls for less axial runout.

The OSG-Sterling flat die catalogue shows a ground chamfer and a radius runout as separate edge preparations. It asks for a chamfer angle and length for a special chamfer, and an angle and length expressed in pitches for its radius runout option. It also asks buyers to identify the active edge. Kadimi's tooling drawings illustrate how a radius can blend the thread root into the shank. These are examples of supplier definitions. Use the drawing and units agreed for your order.

Compare the part drawing, tool drawing and trial result

Shoulder-side checks for a flat die quotation
What you need to establishEvidence to compareBuying decision
Full-profile thread reaches the required positionMeasure from the shoulder to the full-profile boundary with the agreed method. Record the part revision and test condition.Ask for separate results for the full-profile boundary and the first visible trace.
The transition clears the mating entryCompare the thread runout and any unthreaded land with the approved mating entry and seating face.Include a fit check if seating is critical. Approve any mating relief or part change with the design owner.
The die edge clears the head or shoulderReview the blank section, active edge, holder position and the supplied edge drawing as a set.Request the exact chamfer or radius description and the inspection scope before releasing the purchase order.
The paired tool can be traced after the trialRecord die identification, working edge and mounting position with the measured samples.Agree what the supplier must reproduce on a repeat pair and which checks belong to the machine trial.

If the toolmaker specifies an edge length in pitches, confirm how it is measured on the drawing. For illustration, a length of 1.5 pitches on a 1.25 mm pitch equals 1.875 mm when the agreed dimension is axial. That conversion describes the stated tool dimension. Measure the resulting boundary on the rolled part independently.

What if the first thread trace looks close enough?

Suppose a drawing limits the distance from the shoulder to the nearest full profile to 2.0 mm. A trial piece has a trace at 1.2 mm and reaches the full profile at 2.4 mm. On that drawing and with a suitable measurement, it misses the limit by 0.4 mm. The dimensions are illustrative. Use the sketch to show which boundary moved. If several trials agree, have the toolmaker check the active edge profile and mounting position against the blank shoulder before asking for a sharper edge or a new set.

A thread ring result can be part of the dimensional report under the agreed inspection plan. If its travel is limited near the shoulder, record the stop position and use the specified method to locate the profile boundary. An axial profile or other agreed inspection can provide evidence where the ring result alone leaves that boundary unresolved. For mounting and first-piece evidence, see the flat die pair setup guide.

What to send with a request for quotation

Send the finished part and blank drawings, the thread designation, the material condition at rolling, the machine and holder, and a marked view of the working edge. Include a mating-section drawing if seating matters. For a repeat set, add the original die IDs, a marked trial piece or report, and the distance from the shoulder to the measured full profile. Ask the supplier to list the proposed edge and the finished-part checks included in the quotation.

If the full profile is short on one side only, record where around the circumference you measured it. Compare the same locations on a retained good sample and check whether the shoulder datum and sample seating were repeatable. Ask the supplier to review the paired dies and their installed orientation if the difference persists. Keep this comparison with the profile record so a change to the drawing is distinguishable from a change to the setup.

Jungu flat thread rolling die blocks shown as a pair
Flat rolling die blocks from Jungu’s catalogue. The edge geometry for a shouldered part belongs on the approved tool drawing.

See thread rolling dies for screws and bolts and the thread rolling die range. Send the marked shoulder and thread drawings for a tooling quotation.